|
|
Mysteel Tangshan Region Blast Furnace Overhaul Survey
|
|
|
Date:[3/16/2016] Source:Shandong Hai Steel Co.,Ltd
|
|
|
Mysteel Tangshan Region Blast Furnace Overhaul Survey There are 31 blast furnaces undergoing maintenance (including production halts) or being idled among the total 164 blast furnaces in Tangshan region this week. A total blast furnace volume of 19,450 m3 is unproductive, increasing by 40 m3 from last survey, with the capacity utilization rate at 86.33%, decreasing by 0.64% from last survey. The total affected output this time remains at 337,700 tonnes, or 13.67% of normal production.
|
|
|
|
|
|
|