|
|
Mysteel Tangshan Region Blast Furnace Overhaul Survey
|
|
|
Date:[5/13/2016] Source:Shandong Hai Steel Co.,Ltd
|
|
|
Mysteel Tangshan Region Blast Furnace Overhaul Survey There are 28 blast furnaces undergoing maintenance (including production halts) or being idled among the total 164 blast furnaces in Tangshan region this week. A total blast furnace volume of 16,468 m3 is unproductive, down 6,950 m3 from last survey, with the capacity utilization rate at 88.01%, up 4.15% from last survey. The total affected output this time remains at 327,000 tonnes, or 11.99% of normal production.
|
|
|
|
|
|
|